Fulton Hogan, recognising the need for an expedited retaining wall solution, approached Precast Elements to surpass the efficiency of existing in-situ concrete designs. Leveraging our extensive experience in diverse connection methodologies, we devised an innovative product that integrates an in-situ stitch pour directly into the foundation slab.


This forward-thinking approach not only streamlined the construction process but also introduced a level of efficiency that exceeded traditional methods. The installation pace was notably accelerated, with up to 37 meters of these 6.5-meter tall retaining walls seamlessly integrated into the project each day.